Indices of the value of construction put in place, Slovenia, August 2021

The value of construction put in place 1.4% higher than in July 2021 and 6.8% lower than in August 2020

The value of construction put in place in August 2021 was higher than in July 2021 and lower than in August 2020.  

  • 15 October 2021 at 10:30
  • |
  • provisional data
The value of construction put in place in August 2021 higher than in the previous month 

In comparison with July 2021, the value of construction put in place in August 2021 increased by 1.4%. This time it increased over the previous month, after it had decreased during the previous month (in July 2021 it was 4.0% lower than in June 2021). As regards buildings it went up by 11.4%; on non-residential buildings it went up by 44.5%, while on residential buildings it went down by 16.1%. The value of construction put in place on civil engineering decreased by 4.6% and as regards specialised construction activities by 3.9%. 

The value of construction put in place in August 2021 lower than in August 2020
 

In comparison with August 2020, the value of construction put in place in August 2021 decreased by 6.8%. However, all the values of construction put in place were not lower. As regards buildings it went down by 20.1% and as regards civil engineering by 5.2%. The value of specialised construction activities went up by 3.4%. In comparison with August 2019, the value of construction put in place decreased by 5.7%. 

The value of construction put in place in the first eight months of 2021 lower than in the same period of 2020
 

The value of construction put in place in the first eight months of 2021 decreased by 4.2% compared to the same period of the previous year. As regards buildings it went down by 18.9%, while as regards civil engineering it went up by 6.7%. The value of specialised construction activities went down by 1.5%. 

Tables with the latest data are available in the SiStat Database.
Real indices of the value of construction put in place, Slovenia (Ø2015=100)
Real indices of the value of construction put in place, Slovenia (&Oslash2015=100)
1) In the trend-cycle component the most recent data are unreliable (the end-point problem).
Source: SURS
Real indices of the value of construction put in place, Slovenia
VIII 2021
VII 2021 
VIII 2021
VIII 2020
I–VIII 2021
I–VIII 2020
VIII 2021
 Ø 2015 
Construction101.493.295.8120.2
  construction of buildings111.479.981.189.4
  civil engineering95.494.8106.7103.3
  specialised construction activities96.1 M103.4 M98.5 M195.2 M
M less reliable estimate – use with caution
Source: SURS
METHODOLOGICAL NOTE
Data are seasonally adjusted. 
Data for the last 6 months are provisional. With each release the data for the last 6 months can be corrected and supplemented with new data