Indices of the value of construction put in place, April 2025

The value of construction put in place up monthly, but down year-on-year

The value of construction put in place in April was 4.0% higher than in the previous month and 5.9% lower than in the same month a year ago.

  • 13 June 2025 at 10:30
  • |
  • provisional data
The value of construction put in place higher than in the previous month … 

At the monthly level, the value of construction put in place in April increased by 4.0%. As regards civil engineering, it went up by 5.6%, as regards buildings by 2.7% and as regards specialised construction activities by 0.9%.

… but lower than a year ago, …

Year-on-year, the value of construction put in place in April decreased by 5.9%. As regards civil engineering, it went down by 10.9%, as regards buildings by 4.1% and as regards specialised construction activities by 0.9%.

… and compared to the first four months of 2024

The value of construction put in place in the first four months of this year decreased by 8.1% over the same period of the previous year. However, it only went down as regards civil engineering (by 19.0%) and as regards buildings (by 4.0%), while as regards specialised construction activities it went up by 2.5%.

Tables with the latest data are available in the SiStat Database.
Real indices of the value of construction put in place, Slovenia
Real indices of the value of construction put in place, Slovenia
Real indices of the value of construction put in place, Slovenia
Apr 2025
Mar 2025 
Apr 2025
Apr 2024
Jan–Apr 2025
Jan–Apr 2024
% change
Construction4.0-5.9-8.1
  construction of buildings2.7-4.1-4.0
  civil engineering5.6-10.9-19.0
  specialised construction activities0.9-0.92.5
METHODOLOGICAL NOTE
The release was prepared based on seasonally and calendar adjusted data, and calendar adjusted data. When comparing the reference month/quarter with the previous month/quarter, we use seasonally and calendar adjusted data. When comparing with the same period of the previous year, we use calendar adjusted data.

Time series are directly seasonally adjusted, which means that for every time series its own model is set up. Because the models are not mutually linked, possible links that are present in original data of several time series do not apply for results of seasonal adjustment of these time series.

Data published for the past 6 months are provisional. Data for this period may change when a new time point is published. 

During the transition period after SKD 2025 (NACE Rev. 2.1) entering into force, statistical data will still be collected and published according to SKD 2008 (NACE Rev. 2). The transition periods will vary depending on the individual surveys.

Additional explanations are available in the methodological explanations.
When making use of the data and information of the Statistical Office of the Republic of Slovenia, always add: "Source: SURS". More: Copyright.